Tel.: +7 (499) 517--76-74

Highways

Repair of the federal highway M-1, M-8 "Kholmogory"
Date of works: August 2015
Length: 6 468 m
Volume: Alphabit PBV – 300 tons
ABS manufacturer: Road Management Ltd.
General customer: FKU Uprdor “Kholmogory”
Distance and time of Alphabit delivery to the facility: 470 km – 12 hours
Nevsky Prospect one of the longest streets of Saint-Petersburg.
Contractor: VAD CJSC.
Type and year of works performance: arrangement of roadbed (145 thous. m2), 2013.
Volume of Alphabit PBV: 802 tons.
Comments: Daily traffic on Nevsky Avenue is about 12 thous. cars. Alphabit PVB was specially designed for this project as it has increased resistance to tracking and dynamic influences.
Terms of delivery of Alphabit PVB to the facility: daily volume is 100-125 tons.
Third transportation ring, Moscow
Contractor: Road-Center Ltd.
Type and year of works performance: arrangement of roadbed (6150 m2), 2013.
Volume of Alphabit PVB: 45 tons.
Comments: Despite the operating and landscape difficulties, the high level of roadway quality is ensured.
Distance of Alphabit PVB delivery to the facility: 210 km.
Voykov overhead passing, Leningradsky Prospect, Moscow.
Contractor: Soyuz-Les CJSC.
Type and year of works performance: arrangement of roadbed (9600 m2), 2013.
Volume of Alphabit PVB: 65 tons.
Comments: for most contractors, it was the first experience of PVB operation within the inner objects. Therefore, they were provided with training materials on operation of PVB Alphabit, recommendations on the content, mode of use, features of transportation and ABS stacking.
Distance of Alphabit PVB delivery to the facility: 240 km.
Rublevskoe highway is one of the main direct highways of Moscow.
Contractor: Transstromservice Ltd.
Type and year of works performance: arrangement of roadbed (245 thous. m2), 2012.
Volume of Alphabit PVB: 1630 tons
Comments: high quality of the road bed taking into account operation intensity.
Distance of Alphabit PVB delivery to the facility: daily volume 175-200 tons.
Kutuzovsky Prospect, Moscow.
Contractor: Transstromservice Ltd.
Type and year of works performance: arrangement of roadbed (160 thous. m2), 2012.
Volume of Alphabit PVB: 1012 tons.
Comments: usage of PVB for mixtures ЩМА-10, ЩМА-15 and ЩМА-20 is tested. Flexibility of PVB allowed renovation of movement immediately after the use.
Distance of Alphabit PVB delivery to the facility: 200 km, 6 hours.
Bypass of VelskTraversing the city of Velsktwo-lane bypass road (section of the highway M-8, about 40 km long), Arkhangelsk Region.
Contractor: VAD CJSC.
Type and year of works performance: arrangement of roadbed (22 thous. m), 2012.
Volume of Alphabit PVB: 2680 tons.
Comments: two-lane road section (includes two overpasses over the railroad and 150-meter bridge over the river Vel) with a permanent surface. Maximum permissible speed of bypass ─ 100 km/hour.
Distance of Alphabit PVB delivery to the facility: 870 km.
Highway М-4 «Don», Krasnodar Kray.
Contractor: AVTOBAN DSK OJSC
Type and year of works performance: arrangement of roadbed (8550 M), 2012.
Volume of Alphabit PVB: 1020 tons
Comments: structure of non-rigid design of the roadway based on the slag in combination with PVB, dispersion-reinforced asphalt and macadam-sand mixtures is developed on the request of GK "Avtodor" with no analogues in Russia. Result ─ high evenness of road coverage.
Distance of Alphabit PVB delivery to the facility: 860 km, 35 hours.
Maryinsky Park Street, Moscow.
Contractor: Asdor Ltd.
Type and year of works performance: testing of the roadbed arrangement with application of PVB Alphabit in autumn and winter (600 m), 2011.
Volume of Alphabit PVB: 75 tons.
Comments: three mixtures of PVB Alphabit were tested with a focus on different working conditions (low temperatures, snow) and operating features. Test areas were milled prior to ABS laying. Treatment with bitumen emulsion was performed prior to laying of polymer bitumen-concrete mixture. One of three formulations tested was taken as the basis for formulation of PVB Alphabit F-1.
Distance of Alphabit PVB delivery to the facility: 220 km, 3.5 hours.
Stretch of Kashiro-Simferopolskoe highway (26+965-29+200), route А-108, Moscow region.
Contractor: FGU DEP No.17.
Type and year of works performance: laying of bitumen-concrete mixture in accordance with the Regulations on the conduct of comparative tests of PBV (235 m), 2011.
Volume of Alphabit PVB: 25 tons.
Comments: testing involved six domestic suppliers of PBV. Laboratory control was performed by "Innovative Technical Center" Ltd.
Distance of Alphabit PVB delivery to the facility: 270 km, 7 hours.
MKAD (67-67+755,5) one of the most loaded sections of the highway.
Contractor: Ruslan-1 Ltd.
Type and year of works performance: arrangement of roadbed (755.5 m), 2011.
Volume of Alphabit PVB: 75 tons.
Comments: before laying, MKAD was subjected to testing of the readiness for operation with PBV Alphabit in the production site ABZ-Salaryevo.
Distance of Alphabit PVB delivery to the facility: 240 km, 5 hours
Section of M-4 "Don" route to bypass the city of Bogoroditsk, Tula region first experience of usage PVB Alphabit on the federal highway within the CFD.
Contractor: Trud CJSC.
Type and year of works performance: arrangement of roadbed (370 m), 2009.
Volume of Alphabit PVB: 60 tons.
Comments: used material: ABS Type A Mark I using PBV Alphabit and mineral filler ─ break stone of gabbro-diabase Karelian deposit.
Result ─ significantly less exhibited peeling of the coating compared with areas in which the PBV of other manufacturers was used.
Distance of Alphabit PVB delivery to the facility: 200 km, 6 hours.
Trade Center "Golden Babylon» is one of the largest shopping centers in Moscow and Europe.
Contractor: “RG SP “Avtoban” Ltd.
Type and year of works performance: arrangement of roof covering and laying of polymer asphalt-concrete coating with a slope angle of 42 ° for fright service of automobile transportation (580 m), 2008.
Volume of Alphabit PVB: 48 tons.
Comments: Cast asphalt-concrete based on PBV Alphabit 40 with additives that increase the ABS workability was used. Results ─ required performance coating characteristics are achieved.
Distance of Alphabit PVB delivery to the facility: 300 km, 10 hours.